6 results
6-K
EX-99.1
PLM
Polymet Mining Corp
30 Dec 22
Form 43-101F1 Technical Report
5:25pm
18.5.3 Fire Water Distribution
18.5.4 Sewage Collection and Treatment
18.6 Flotation Tailings Basin (FTB)
18.7 Wastewater Treatment
18.7.1 Mine … Site Wastewater Collection and Distribution
18.7.2 Wastewater Treatment System
18.8 Power Supply
18.8.1 Plant Power Supply
18.8.2 Mine Site Power
6-K
EX-99.1
PLM
Polymet Mining Corp
30 Dec 22
PolyMet Mining releases updated NI 43-101 Technical Report
8:37am
processing plant and using state-of-the-art wastewater treatment to clean up water issues from legacy iron-ore operations at the site.
The revised capital
6-K
EX-99.1
PLM
Polymet Mining Corp
28 Nov 22
Mesaba Project Form 43-101F1 Technical Report – Mineral Resource Statement
7:02am
conditions is possible. Continued monitoring and testing of existing long term HCT’s to support waste pad design, wastewater management requirements and water … HCT’s to support waste pad design, wastewater management requirements and water quality forecasting is required.
The Duluth Complex along with other
6-K
EX-99.1
PLM
Polymet Mining Corp
5 Apr 13
Current report (foreign)
12:00am
.
In addition to the above listed sources, solid wastes from the wastewater treatment facility at the mine sire (WWTF) would be recycled directly
6-K
EX-99.1
PLM
Polymet Mining Corp
31 Oct 12
Report of Foreign Private Issuer
12:00am
, solid wastes from the wastewater treatment facility at the mine sire (WWTF) would be recycled directly into the Hydrometallurgical Plant to recover
6-K
EX-99.1
3zk64j9r
13 Nov 06
Technical Report on the Results of a Definitive Feasibility Study of the NorthMet Project
12:00am
- Prev
- 1
- Next